Welding work carried out in NICH nursery in presence of infants in Karachi
Most outlets reported the incident of welding work being conducted inside the National Institute of Child Health (NICH) nursery in Karachi, with infants present, as shown in a video that emerged on social media. Geo News described the welding work as happening at the nursery entrance and included a visual reference, while 24 News HD specified the estimated number of newborns present as 80 to 120.
Summary generated by HarZaviya from the headlines and excerpts of the 3 outlets below. Each outlet's own headline is listed under it.
Same story from 3 outlets
Each outlet's own headline, most recent first — read any at its source.
-
Welding Work Conducted Inside Karachi Hospital Nursery With Newborns Present
A video showing welding work being carried out inside a nursery of the National Institute of Child Health (NICH) in… Read More
-
Welding work carried out in NICH nursery in presence of infants in Karachi
A video emerged on social media showing welding work inside the National Institute of Child Health (NICH) nursery in Karachi, with 80 to 120 newborn babies present, reported 24NewsHD TV channel on Monday.
-
Welding work carried out in Karachi's NICH nursery in presence of infants
This collage shows a man doing welding work at the entrance of NICH nursery in Karachi. — ReporterKARACHI: A video showing welding work inside the nursery of the National Institute of Child Health in Karachi, with newborn babies present, surfaced on Sunday.The...
3 articles from 3 outlets, 20 Sep–21 Sep 2026. Headlines and links belong to their outlets — HarZaviya links out and never copies article text. What does % identical mean?