---
title: "NHA completes restoration of Haramosh Bridge after heavy rainfall"
description: "Most outlets reported that the National Highway Authority (NHA) has completed restoration work on the Haramosh Bridge, noting the location on the Jaglot-Skardu Road and the damage caused by heavy rainfall. Both excerpts emphasize the completion of the restoration and the cause of the damage, with no additional framing or emphasis."
url: https://harzaviya.com/stories/766-nha-completes-restoration-of-haramosh-bridge-after-heavy
site: HarZaviya
language: en
---

# NHA completes restoration of Haramosh Bridge after heavy rainfall

pakistan · updated 29 Jul 2026, 5:40 AM PKT · 29 Jul 2026 · 2 articles from 2 outlets

**HarZaviya summary** — how 2 outlets covered this, generated automatically from their headlines and excerpts:

> Most outlets reported that the National Highway Authority (NHA) has completed restoration work on the Haramosh Bridge, noting the location on the Jaglot-Skardu Road and the damage caused by heavy rainfall. Both excerpts emphasize the completion of the restoration and the cause of the damage, with no additional framing or emphasis.

## Same story from 2 outlets

Each outlet's own headline, most recent first — read any at its source.

- **Business Recorder** — [Haramosh Bridge: Restoration work completed](https://www.brecorder.com/news/40432262/haramosh-bridge-restoration-work-completed) · 29 Jul 2026, 5:40 AM PKT
  > ISLAMABAD: The National Highway Authority (NHA) has successfully completed restoration work on the Haramosh Bridge, located at RD-25 on the Jaglot-Skardu Road (JSR), which was recently damaged by heavy rainfall. According to an NHA spokesperson, the bridge has been fully restored and reopened to all types of vehicular traffic, ensuring uninterrupted movement across the region. The restoration w...
- **Daily Times** — [NHA restores Haramosh Bridge on JSR route for traffic](https://dailytimes.com.pk/1529951/nha-restores-haramosh-bridge-on-jsr-route-for-traffic/) · 29 Jul 2026, 1:51 AM PKT · 87% identical wording to the newest filing
  > The National Highway Authority (NHA) has successfully completed the restoration work on Haramosh Bridge, located at RD 25 on the Jaglot-Skardu Road (JSR), which was recently affected by heavy rainfall. According to an NHA spokesperson, the bridge has been fully restored and reopened for all types of traffic, ensuring uninterrupted movement across the region. The […]

2 articles from 2 outlets, 29 Jul 2026. Headlines and links belong to their outlets — HarZaviya links out and never copies article text.

---

HarZaviya compares how Pakistani outlets cover the same story. It stores and shows each outlet's headline and a short excerpt, and links out — it never copies article text, and every headline belongs to the outlet that wrote it. It takes no stance on any outlet.

Pages: [Top stories](https://harzaviya.com/) · [Latest headlines](https://harzaviya.com/feed) · [Archive](https://harzaviya.com/archive) · [Why](https://harzaviya.com/why) · [Sources](https://harzaviya.com/sources) · [Methodology](https://harzaviya.com/methodology) · [About](https://harzaviya.com/about) · [About the bot](https://harzaviya.com/about-bot)
Trackers: [Gold prices](https://harzaviya.com/gold-prices) · [Fuel prices](https://harzaviya.com/fuel-prices) · [Stock exchange](https://harzaviya.com/stock-exchange)

Any page on this site is available as markdown: send `Accept: text/markdown`, or add `.md` to the path.
