---
title: "KP CM inaugurates Hayatabad Toll Plaza underpass"
description: "All outlets reported the inauguration of the Hayatabad Toll Plaza underpass by Khyber Pakhtunkhwa Chief Minister Muhammad Sohail Afridi, noting the project’s Rs1.6 billion cost and 90-day completion timeline. Most led with the event and its significance for improving traffic flow, with the Associated Press of Pakistan and Daily Times including slightly more detail about the location and purpose. Business Recorder and ProPakistani also emphasized the cost and speed of construction. Framing was largely uniform, with no outlets introducing additional context or emphasis beyond the project’s completion and function."
url: https://harzaviya.com/stories/11625-kp-cm-opens-hayatabad-toll-plaza-underpass
site: HarZaviya
language: en
---

# KP CM inaugurates Hayatabad Toll Plaza underpass

pakistan · updated 1 Oct 2026, 12:44 PM PKT · 30 Sep – 1 Oct 2026 · 5 articles from 5 outlets

**HarZaviya summary** — how 5 outlets covered this, generated automatically from their headlines and excerpts:

> All outlets reported the inauguration of the Hayatabad Toll Plaza underpass by Khyber Pakhtunkhwa Chief Minister Muhammad Sohail Afridi, noting the project’s Rs1.6 billion cost and 90-day completion timeline. Most led with the event and its significance for improving traffic flow, with the Associated Press of Pakistan and Daily Times including slightly more detail about the location and purpose. Business Recorder and ProPakistani also emphasized the cost and speed of construction. Framing was largely uniform, with no outlets introducing additional context or emphasis beyond the project’s completion and function.

## Same story from 5 outlets

Each outlet's own headline, most recent first — read any at its source.

- **ProPakistani** — [CM KP Inaugurates New Rs. 1.6 Billion Underpass in Peshawar](https://propakistani.pk/2026/10/01/cm-kp-inaugurates-new-rs-1-6-billion-underpass-in-peshawar/) · 1 Oct 2026, 12:44 PM PKT
  > Khyber-Pakhtunkhwa Chief Minister Muhammad Sohail Afridi inaugurated the Hayatabad Toll Plaza Underpass on Wednesday. The Rs1.6 billion project was completed… Read More
- **Business Recorder** — [KP CM inaugurates Hayatabad Toll Plaza underpass](https://www.brecorder.com/news/40442077/kp-cm-inaugurates-hayatabad-toll-plaza-underpass) · 1 Oct 2026, 5:32 AM PKT · 90% identical wording to the newest filing
  > PESHAWAR: Chief Minister Khyber Pakhtunkhwa Muhammad Sohail Afridi inaugurated the Hayatabad Toll Plaza Underpass on Wednesday. Constructed at a cost of Rs1.6 billion, the Hayatabad Toll Plaza Underpass has been completed within a short period of 90 days. The project has a total length of 500 metres, including a 130-metre-long barrel, and comprises 665 piles and a two-lane underpass. The underp...
- **Daily Times** — [KP CM opens Hayatabad Toll Plaza Underpass](https://dailytimes.com.pk/1560780/kp-cm-opens-hayatabad-toll-plaza-underpass/) · 1 Oct 2026, 4:09 AM PKT · 89% identical wording to the newest filing
  > Khyber Pakhtunkhwa Chief Minister Muhammad Sohail Afridi on Wednesday inaugurated the Hayatabad Toll Plaza underpass, an Rs 1.6 billion project completed in 90 days to improve traffic flow between De Tour Road on the Bara side and Ring Road. The 500-metre-long underpass, including a 130-metre barrel, has two lanes and 665 piles. It is designed […]
- **Dunya News** — [KP CM Afridi inaugurates Hayatabad Toll Plaza underpass](https://dunyanews.tv/en/Pakistan/975467-kp-cm-afridi-inaugurates-hayatabad-toll-plaza-underpass) · 30 Sep 2026, 8:58 PM PKT · 91% identical wording to the newest filing
  > KP CM Sohail Afridi inaugurates Rs1.6 billion Hayatabad underpass, completed in 90 days to improve traffic flow in Peshawar.
- **Associated Press of Pakistan** — [KP CM opens Hayatabad Toll Plaza underpass completed in 90 days](https://www.app.com.pk/kp/kp-cm-opens-hayatabad-toll-plaza-underpass-completed-in-90-days/) · 30 Sep 2026, 7:44 PM PKT · 88% identical wording to the newest filing
  > Khyber Pakhtunkhwa Chief Minister Muhammad Sohail Afridi on Wednesday inaugurated the Hayatabad Toll Plaza underpass, a Rs1.6 billion project completed in 90 days to improve traffic flow between De Tour Road on the Bara side and Ring Road.

## Part of a bigger story

Other stories whose coverage resembles this one, nearest first. "% related" compares whole stories, not single articles — see [what the percentages mean](https://harzaviya.com/methodology).

- [CM Afridi launches underpass project in Peshawar](https://harzaviya.com/stories/5146-peshawar-to-get-a-new-underpass) · 28 Aug 2026 · 2 outlets · 78% related

5 articles from 5 outlets, 30 Sep – 1 Oct 2026. Headlines and links belong to their outlets — HarZaviya links out and never copies article text.

---

HarZaviya compares how Pakistani outlets cover the same story. It stores and shows each outlet's headline and a short excerpt, and links out — it never copies article text, and every headline belongs to the outlet that wrote it. It takes no stance on any outlet.

Pages: [Top stories](https://harzaviya.com/) · [Latest headlines](https://harzaviya.com/feed) · [Archive](https://harzaviya.com/archive) · [Why](https://harzaviya.com/why) · [Sources](https://harzaviya.com/sources) · [Methodology](https://harzaviya.com/methodology) · [About](https://harzaviya.com/about) · [About the bot](https://harzaviya.com/about-bot)
Trackers: [Gold prices](https://harzaviya.com/gold-prices) · [Fuel prices](https://harzaviya.com/fuel-prices) · [Stock exchange](https://harzaviya.com/stock-exchange)

Any page on this site is available as markdown: send `Accept: text/markdown`, or add `.md` to the path.
